Plans have always been central to business continuity. They provide a roadmap to follow during incidents, allocate responsibilities for leading and managing recovery, and provide evidence that disruption has been considered strategically. Yet the conventional business continuity plan (BCP) can create a practical problem. As it becomes more comprehensive, it can become harder to use during a fast-moving incident.
BCPs by their nature tend to be inflexible and often contain out-of-date information, unless the organization is lucky and an incident occurs very soon after a plan update. Experienced incident teams respond by adapting: selecting the actions that remain relevant, disregarding those that do not, and developing new combinations of response measures as the situation evolves. The written business continuity plan often becomes a source of information rather than the route through the incident; at worst, it is put to one side as irrelevant to the current crisis.
That does not mean the organization should become planless; however, it suggests that a new approach might be overdue.
Lessons from emergency services
I have been a Mountain Rescue volunteer in the UK for more than 20 years and have managed many incidents in that role. These have varied widely in type and scale, but in the incidents I have been involved with, we have never used a pre-written incident response plan equivalent to a BCP. Instead, we have managed each incident using what are basically a range of response modules, each with its own parameters, background information, core skills, and risk assessments. We exercise each module frequently to help responders develop expertise and muscle memory.
The system works. During an incident, the leader assesses which response modules are appropriate and activates those needed.
It has always struck me that this approach would work well in an organizational setting. Instead of developing an overarching business continuity plan for each business unit or regional organization, we could develop a selection of modular, pre-planned, well-exercised response capabilities. This could make incident response more adaptive and more effective. Let’s call each of these a modular pre-planned response capability (MPRC).
From plan-centred to capability-centred business continuity
An MPRC could be defined as a self-contained, pre-developed, and regularly exercised capability designed to address a defined operational impact or protect a required outcome during disruption. The same MPRC could be used in multiple contexts.
Each MPRC would bring together the people, authority, actions, information, resources, and dependencies required for implementation. It could be activated alone or combined with other MPRCs within the organization’s incident management structure.
The word ‘modular’ is important. An MPRC would not simply be a shorter plan or a section removed from a larger BCP. It would need to be sufficiently self-contained to activate quickly, while being designed to connect interoperably with other response capabilities.
With MPRCs, the primary unit of business continuity management would change from the plan to the capability.
This would also change the question asked during preparedness. Instead of asking whether there is a business continuity plan, the organization would ask whether it possesses the capabilities it would need during an incident.
This is totally in line with conventional business continuity thinking that planning does not rely on scenarios; instead, it considers impacts: to people, processes, premises, and providers. Building modular pre-planned response capabilities associated with impact types seems to make complete sense to me.
The starting point would still be the BIA
The starting point for the MPRC approach would still be the business impact analysis (BIA). A BIA should identify critical services and activities, the consequences of their disruption over time, relevant time thresholds, required resources, and important internal and external dependencies. This establishes what must be protected and helps identify the conditions within which the response will have to operate.
However, MPRCs would not necessarily correspond one-for-one with BIA impact categories or business processes. The BIA identifies the consequences that require management. The MPRCs represent the capabilities that can prevent, reduce, or manage those consequences. One impact may require several MPRCs, while the same MPRC may contribute to the protection of several services.
The BIA would inform which MPRCs the organization needs. During an incident, the incident manager and their team would decide which of those capabilities to activate as the situation develops.
Where planning comes in
Hopefully, it is clear from the above that MPRCs would be capabilities. Basically, that means that they would be things that people do during an incident, supported by appropriate resources, tools, and equipment. However, each MPRC would also need two types of documentation: standard operating procedures (SOPs) and supporting information. And this is where the planning would come in. The people activating an MPRC would need rapid access to the information required to carry out the response or recovery actions it covers. This could include contact information or system settings, for example. The required information would obviously need to be kept up to date, but the smaller, self-contained nature of each individual MPRC would make this more achievable than it would be for a large-scale, comprehensive BCP.
SOPs would provide a structure for the activities of the MPRC and a basis for exercising them. They could, for example, set out orchestration steps.
The centrality of regular exercising
Regular exercising would be vital for the MPRC model. This would not mean yearly; it would mean frequently. Each MPRC would be exercised with the people expected to deliver it, so that roles, actions, and communications would become familiar. Repetition would build mental and physical muscle memory, reduce the cognitive burden during activation, and reveal whether the underlying resources and information remain usable. It would also help identify weaknesses in the MPRC.
Muscle memory would need to avoid becoming rigid behaviour. Exercises would vary the circumstances, scale, timing, and constraints under which the MPRC would be deployed. Participants would need to understand the purpose and limits of the capability, not merely rehearse a fixed sequence.
Exercising individual MPRCs would be only part of the requirement. Organizations would also need to exercise combinations of MPRCs in wider exercises using severe but plausible scenarios.
Incident management
MPRCs would sit at the heart of incident management. They would be capabilities used within a common command and coordination structure that would establish roles, decision rights, escalation routes, meeting rhythms, information requirements, communication protocols, and record-keeping arrangements. This stable spine would allow the operational response to remain flexible without becoming fragmented.
When disruption occurred, the incident manager would assess the developing impacts and activate the relevant MPRCs. Capability and service owners would provide specialist advice, while the incident management team would set priorities, allocate scarce resources, and coordinate the MPRC teams. As the incident evolved, the incident manager could activate additional MPRCs, adapt those already in use, or stand down those no longer needed.
The MPRC model would demand competent incident managers with strong decision-making skills. If situational awareness were poor, decision rights ambiguous, or modules unmaintained, flexibility could easily become confusion. MPRCs would not be permission to rely on improvisation. They would offer prepared building blocks and an overall framework from which an adaptive but controlled response could be constructed.
A starter for ten
This article is very much meant to be a discussion starter. It addresses a common issue in the business continuity profession: plans do not always work as expected during an incident. An unwieldy or out-of-date BCP can slow the response. At worst, it is not used at all.
The approach I have described comes from my experience in Mountain Rescue. Here is it is not given a particular name; it is just the way that things have evolved over time. But it works! It is an approach to preparing, exercising, and deploying response capabilities that is transferable to business continuity and could bring many benefits.
For some less constrained organizations, the MPRC could replace the business continuity plan. For those that operate in a regulated environment or where there is a policy of alignment with ISO 22301 or the BCI’s Good Practice Guidelines, business continuity plans remain essential. In these situations, it would certainly be possible to use MPRCs as part of the structure of a BCP; alternatively, the MPRC approach could sit alongside, forming the basis of operational response capabilities while being informed by the overarching BCP.
The MPRC is a flexible concept which I believe has potential. I would be very pleased to have a wider discussion about the concept with anyone interested in exploring it further.